Work is currently underway at Les Orres 1800 (construction of an underground parking lot and two tourist residences), to improve the area's infrastructure and amenities. For the duration of the works, access, traffic and parking in the resort may be temporarily modified. On this page, you'll find all the practical information and facilities we've put in place to make your stay easier.

  • Odalys and Pk2 covered parking lot in Les Orres 1800
  • Kalystra in Les Orres 1800

ACCESS TO ORRES 1800 - General traffic

  • The road will remain closed at Terre Rouge, opposite the Odalys worksite.
  • Access to Pk2 (entrance and exit) during the opening period will be two-way via the intersection under 1800
  • Access to Orres 1800 and the central artery will also remain two-way
  • No construction equipment is scheduled to circulate in 1800 Centre during the operating season

WORKING HOURS

  • 7 a.m. to 6 p.m., Monday to Friday
  • Most of the work will now take place indoors, so the impact is reduced.
  • For the various phases of exterior cladding, particular attention has been paid to noise pollution between 7am and 9am.

MACHINE TRAFFIC

  • Early June to June 19 maximum: dumpers between Kalystra and Odalys via the Prébois runway / Watering planned on the runway if necessary
  • During the summer season, occasional supply truck traffic.

PARKING - PARKING INFO

PK2 indoor parking lot, Les Orres 1800

  • The PK2 indoor parking lot in Les Orres 1800 is closed until July 17, 2026.

    --> OPEN FROM JULY 18 TO AUGUST 23, 2026 / Accessonly via the intersection under 1800

    Outside these dates, the parking lot will be closed to allow work on the facade of the residence.

  • Daily and weekly hourly spaces.
  • 418 spaces available on 3 levels (92 for the residence, 326 public)
  • Height: 2m10
  • Installation of electric charging stations for winter 2026-2027

RATES PK2 PARKING INFO

FOOTPATH 1800 -> 1650

For this summer 26:

  • the footpath will be signposted from the foot of the pistes and via the Prébois piste to the footbridge